欧洲日本日产电影中文字幕国产_又大又粗A级毛片免费看_芒果av毛片无码在线观看不卡网_2020亚洲国产中文精品无码剧情_白浆喷水美女网站_女人高潮aa视频免费观看_中文字幕 日韩在线_亚洲综合图区小说专区_日韩国A级片re视频在线播放_久久免费人成精品香蕉

en
current:首頁 > 技術(shù)與設(shè)備
Research on zero discharge of coal chemical wastewater

Technology introduction

EC multistage biochemical combination process of coal chemical industry wastewater treatment technology, can be applied in coal gas, coal, and coking coal chemical industry wastewater treatment field, EC of the combined period of biochemical reactor with high organic load, hydraulic retention time is short, cover an area of an area small, less infrastructure investment, energy consumption and operation cost is low; Easy operation and management, simple maintenance, good effluent water quality, with good phenol and ammonia nitrogen removal ability; Strong process stability, flexible operation mode, combined process start speed, high degree of automation of process equipment advantages. High degree of automation, stable processing effect, low operating cost advantages.

Technical advantages

Efficient removal of typical pollutants in coal chemical wastewater -- polyphenol efficient removal of polycyclic aromatic compounds, heterocyclic compounds and cyanide and other toxic and harmful substances. Efficient removal of ammonia nitrogen, effectively reduce effluent chroma.

Application scenarios

Zero discharge of high phenol ammonia wastewater from coal chemical industry

EC厭氧塔.jpg

中煤集團(tuán)鄂爾多斯煤化工有限公司.jpg

煤化工廢水零排放項(xiàng)目01.jpg

煤化工廢水零排放項(xiàng)目02.jpg

Typical applications

In 2013, the national center for water expert team in Inner Mongolia, China coal ordos energy chemical industry co., LTD., built the first domestic chemical high phenol ammonia wastewater zero discharge demonstration project, coal chemical industry wastewater treatment project, the project of the construction of the wastewater biochemical treatment, and gray water recycle, evaporation crystallization device, such as realized all wastewater recycling and resource utilization, Annual economic benefits of 100 million yuan. The project has been successfully operated for 6 years, and the technology level has been fully mature, which is of great promotion significance.